ICADII

  1. ICAD II has been established by adopting the model of Public & Private Sectors Partnership (PPP model). ICAD II infrastructures were established according to the latest international standards and criteria.

  2. ICAD II is located 30 km from the heart of the city of Abu Dhabi. It covers an area of 11 sq km.

  3. ICAD II contains 101 plots of land allocated for clustering of specialized industries. Those industries are: chemical industries, plastic products industries, engineering industries, and wood products industries, construction materials industries, oil& gas sector industries and services related to oil & gas industries.

  4. AED 11 billion is the volume of investments in ICAD II in regard of capital & operating assets.

  5. In ICAD II there is a road network stretching for 27 km, as well as 21 km of gas pipes, 21 km for drainage, and 60 km pipes to pump out rain waters.

  6. Some factories are already constructed in ICAD II. The remaining factories are to be completed very soon as most of them are in their final stages.

  7. According to the signed contracts, the cost of the infrastructure of ICAD II is AED 450 million. Other contracts were signed with the concerned departments to provide water & electricity services, communication services and other related services. 
» back
 
Mail Site Map
عربي
 
Search
 
 
Existing Zones

 
Services
One Stop Shop (OSS)
Acquiring an industrial license for land development has always been a time consuming process. Shrouded in red tape and entailing endless procedures that have investors running from one government authority to the next
Foreign Labor Services (FLS)

Equally critical is the foreign labor service that ZonesCorp provides. The Ministry of Labor, Immigration Department, Department of Nationalization and Residency and the Personal Identification Department all collaborate under the One-Stop-Shop program

   
 
 
© 2008 ZonesCorp, all rights reserved.